Arapahoe County W&SD South Adams County W&SD – Water
Inverness W&SD South Adams County W&SD – Wastewater
Town of Superior Green Mountain W&SD
City of Thornton Castle Pines North Sanitation District
East Valley W&SD Stonegate Metropolitan W&SD
In addition our personnel have recently completed the following projects:
Arapahoe County Water & Wastewater
Authority SCADA Project
Provided and installed a new SCADA system using Allen-Bradley PLCs and
Wonderware software to automate the water distribution system and booster
pump station. This system utilized spread spectrum radios for the communications
system and Allen-Bradley PLCs for the RTUs and Wonderware man-machine
interface.
ENGINEER: Browns Hill Engineering & Controls, LLC
GENERAL CONTRACTOR: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: November 2000
Arapahoe County Water & Wastewater
Authority Phase II WWTP Expansion
Provided, installed, and started up the control and electrical gear for
the phase II addition to the ACWWA wastewater Treatment Plant. This plant
uses the Zenon treatment and filtration system. This project utilized
Allen Bradley PLCs and Iconics’ Wonderware man-machine interface.
ENGINEER: JVA Consultants & Browns Hill Engineering & Controls,
LLC
GENERAL CONTRACTOR: DCCI
COMPLETION DATE: March 2001
Arapahoe County Water & Wastewater
Authority – Peoria Lift Station
Provided, installed, and started up the control and electrical gear for
the relocation of the Peoria Lift Station for ACWWA. This project utilized
Allen Bradley PLCs and Iconics’ Wonderware man-machine interfaced
over the existing SCADA system with spread-spectrum radios.
ENGINEER: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: March 2005
City of Arvada – South Platte
Reservoir Project
Provided, installed, and started up the control and electrical gear for
the new wells and pumping station. This project utilized Allen Bradley
PLCs and panel mounted displays.
ENGINEER: Applegate Group
GENERAL CONTRACTOR: BT Construction
COMPLETION DATE: March 2004
Aspen Sanitation District WWTF Upgrade
Provided, installed, and started up control and electrical gear for the
facility upgrade and automation project. This project utilized Allen
Bradley PLCs and Intellution’s FIX32 man-machine interface.
ENGINEER: RTW
GENERAL CONTRACTOR: San Juan Construction
COMPLETION DATE: November 1999
Aspen Sanitation District WWTF Sludge
Dewatering Project
Provided, installed, and started up the dewatering system included modifications
to the existing PLC system and additions to the electrical gear.
ENGINEER: CH2M Hill
GENERAL CONTRACTOR: San Juan Construction
COMPLETION DATE: February 2000
Centennial Water District – Marcy
Gulch Controls Upgrade
Provided, installed, and started up a new plant control system for the
facility. The project replaced an existing Bailey DCS system with an
Allen Bradley PLC network and Intellution’s man-machine interface
software.
ENGINEER: Centennial Water and Sanitation District
GENERAL CONTRACTOR: Browns Hill Engineering and Controls, LLC
COMPLETION DATE: March 2003
Cortez WWTP
Provided, programmed, and commissioned electrical gear, control system,
and instruments for the new WWTP. This plant utilizes an Allen-Bradley
SLC/505 with Intellution’s FIX32 man-machine interface.
ENGINEER: Arber & Associates
GENERAL CONTRACTOR: RMCI
COMPLETION DATE: October 2004
Cottonwood Water and Sanitation
District – SCADA System
Provided and installed a new SCADA system using Allen-Bradley PLCs to automate
the water collection system. This system utilizes licensed 450 MHz radios
for the communications system and Allen-Bradley PLCs for the RTUs.
ENGINEER: Browns Hill Engineering & Controls, LLC
GENERAL CONTRACTOR: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: May 1999
Cottonwood Water and Sanitation
District – Well
D11
Provided and installed the control panel with RTU for the new Well site
D11. The RTU integrated into the existing SCADA system.
ENGINEER: Meurer & Associates
GENERAL CONTRACTOR: MW Golden Corp
COMPLETION DATE: February 2004
Durango WTP Surface Wash Addition
Provided, programmed, and commissioned the control system for the new
surface wash system at the water treatment plant. This plant utilizes
a Symax
PLC and Intellution’s FIX32 man-machine interface.
ENGINEER: RTW
GENERAL CONTRACTOR: Southwest Contracting
COMPLETION DATE: May 2000
Durango WTP Phase II
Provided, programmed, and commissioned electrical gear, control system,
and instruments for the phase II addition to the WTP. This plant utilizes
both an Allen-Bradley Controlnet and a Symax PLC and Intellution’s
FIX32 man-machine interface.
ENGINEER: RTW
GENERAL CONTRACTOR: Southwest Contracting
COMPLETION DATE: July 2003
Ranch at Roaring Fork WWTP
Provided and installed the electrical gear and instrumentation and controls
for the project. This project consisted of the construction of a 100,000
GPD WWTP.
ENGINEER: McLaughlin Water Engineers
GENERAL CONTRACTOR: Gould Constructors
COMPLETION DATE: February 2001
Silver Creek – SCADA System
Upgrade
Replaced legacy SCADA System with Allen-Bradley PLCs and 170 MHz licensed
radios. Added RACO autodialer and 2 HMI’s: A-B PanelView and RSView
32. The RTU System consisted of 2 Wells, 1 Tank, 2 Sewage Lift-Stations,
and 2 Remote Offices.
ENGINEER: Browns Hill Engineering & Controls, LLC
GENERAL CONTRACTOR: Hill Engineering & Controls, LLC
COMPLETION DATE: September, 2004
Silverthorne – Zone 3W Pumping
Station
Provided and installed the electrical gear and instrumentation and controls
for the project. This project consists of the construction of a closed
system pumping station.
ENGINEER:Farnsworth & Polk
GENERAL CONTRACTOR: Civil Constructors
COMPLETION DATE: December 2000
South Adams County W&SD – SCADA
System Upgrade Project
Replaced the District’s existing SCADA system with a new PLC based
system. The new system is an Allen-Bradley system with RSView as the man-machine
interface. This system uses 950MHz licensed radios. This project also included
the automation of four booster pumping stations.
ENGINEER: Black & Veatch Engineering
GENERAL CONTRACTOR: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: February 2000
South Adams County W&SD – Well
#79 Station
Provided, programmed and commissioned the electrical gear and controls
for a new well pumping station.
ENGINEER: Muller Engineering
GENERAL CONTRACTOR: Levi Construction
Completion Date: March 2001
South Adams County W&SD – Sable
Pumping Station
Provided, programmed and commissioned the electrical gear and controls
for a new booster pumping station with 700 HP of pumping capacity.
ENGINEER: Muller Engineering
GENERAL CONTRACTOR: Paramount Constructors
COMPLETION DATE: March 2001
St. Mary’s Glacier WWTP
Provided and commissioned the electrical gear and controls for the new
WWTP for the St. Mary’s Glacier Water & Wastewater District.
ENGINEER: Integra Engineering
GENERAL CONTRACTOR: Glacier Construction
COMPLETION DATE: August 2001
Steamboat WWTP Expansion
Provided and installed the electrical gear and instrumentation and controls
for the project. This project consists of the expansion of the Steamboat
WWTP.
ENGINEER: McLaughlin Water Engineers
GENERAL CONTRACTOR: Civil Constructors
COMPLETION DATE: September 2002
Stonegate Metro District SCADA
Provided and installed a new SCADA system using Allen-Bradley PLCs and
RSView software for the MMI to automate the well system, booster station,
and lift stations. The system utilizes spread spectrum radios for the
communications system.
ENGINEER: Browns Hill Engineering & Controls, LLC
GENERAL CONTRACTOR: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: May 1999
Todd Creek – RO Plant
Provided electrical gear, SCADA System, HMI for Reverse Osmosis Filter
Plant. System includes RO Plant Control, 10 Wells, and 1 Tank.
ENGINEER: TST, Inc. – Bob Takeda 303-792-0557
GENERAL CONTRACTOR: Bosco Constructors
COMPLETION DATE: March 2005
Two Rivers WTP and Tank
Provided and installed the electrical gear and instrumentation and controls
for the project. This project consists of the construction of a new WWTP
utilizing the Aeromod treatment system.
ENGINEER:
GENERAL CONTRACTOR: Gould Constructors
COMPLETION DATE: August 2003
Two Rivers WWTP
Provided and installed the electrical gear and instrumentation and controls
for the project. This project consists of the construction of a new WWTP
utilizing the Aeromod treatment system.
ENGINEER: ???
GENERAL CONTRACTOR: Gould Constructors
COMPLETION DATE: August 2003
Winter Park West – SCADA System
Upgrade
Replaced legacy SCADA System with Allen-Bradley PLCs and 450 MHz licensed
radios. Added RACO autodialer and HMI utilizing Genesis 32 software.
The RTU System consisted of 5 Wells, 3 Booster Stations, and 3 Tanks.
ENGINEER: Browns Hill Engineering & Controls, LLC
GENERAL CONTRACTOR: Browns Hill Engineering & Controls, LLC
COMPLETION DATE: February 2005
004425 $85,046.00
Woodmoor – South Filter Plant
Provided, programmed, and installed the electrical gear and instrumentation
and controls for the project. This project consists of a new water filter
treatment plant.
ENGINEER: RTW
GENERAL CONTRACTOR: Bosco Constructors
COMPLETION DATE: November 2003
PROJECT I&C COSTS: $359,000.00
In addition our personnel have provided the electrical and instrumentation
and control system engineering on a variety of projects
including the following:
Aspen Consolidated Sanitation District
• Plant upgrade to incorporate modified treatment processes in the existing
wastewater treatment plant.
• Included modifications to the digester area
• Addition of a flow equalization system, a UV system, and sludge thickener
system.
Metro Wastewater Reclamation
District
• Digester and Sludge Holding Tank design and construction supervision
• Cogeneration Improvements Project design and construction supervision
• Grease Processing Building Project design and construction supervision
• Nitrification Facilities Project design and construction supervision
South Adams County Water & Sanitation
District
• Chlorination Facilities Project design and construction supervision
• Northern Wells Project design and construction supervision
• Chlorine Neutralization Project design and construction supervision
Idaho Falls, Idaho Water Department
• SCADA System Project design and construction supervision and system Water
Department programming
• Well 16 Project design and construction supervision
• Well 17 Project design and construction supervision
• Well 9/10 Upgrade Project design and construction supervision
• Well 4 Upgrade Project design and construction supervision
• Well 5 Upgrade Project design and construction supervision
• Well 12 Upgrade Project design and construction supervision
Sky Ranch WWTP
• Design of a new wastewater treatment plant using sequential batch reactors
for the process treatment.
Southgate Metro District
• Design for monitoring and SCADA system modifications for a new tank addition
and upgrades to the entire SCADA system.
Telluride WWTP Expansion
• Project design and construction supervision
Project 7 Water Authority
• Storage Tank Installation Project design and construction supervision