Pump Stations Improvements
ENGINEER: Carollo
GENERAL CONTRACTOR: PCL Construction
ELECTRICAL CONTRACTOR: Eckstine Electric
COMPLETION DATE: Spring 2018
PROJECT DESCRIPTION: The work consists of construction of the Zone 4C Pump Station, including construction of a new Pump Station Building with Electrical Room, Bathroom, PLC Room, HVAC Room, and Main Pump Station area. The work also includes, but is not limited to four new Pumps, Valves, Flow Meters, Instrumentation, an Electrical Generator, Switchgear, Motor Control Center, Variable Speed Drives, PLC equipment, HVAC equipment, a Bridge Crane, Stormwater improvements, Pump Suction and Discharge Piping.
BROWNS HILL ENGINEERING & CONTROLS (BHEC) SCOPE OF WORK: Provide Electrical System Studies, Main Switchboard, VFD’s, Soft Starters, Power Panels, Lighting Panels, Lighting Transformers, Safety Disconnects, PLC Control Panels, Instrumentation, Radio System, PLC Programming, HMI Programming, Startup and Training Services.